  1. Installation does not require .Net Framework 3.5 anymore.
  2. Connected load correctly displayed in Db schematic labels when using load densities
  3. Correction to the voltage level when using a CTE transformer and a Phase-to-Phase circuit connection
  4. Grouping factor fixed option saving issue
  5. Fix when importing Tysoft DBs with observations
  6. Fix the 'Way from' label on a new page where more than two supplies have been used and the supply board is a Distribution board
  7. Improvements when creating the excel split board report. Now the third split section codes will be removed if only two sections are used
  8. Electronic devices min multiplier Ir setting correction
  9. Performance improvements when applying changes in the selectivity study
  10. Auto updating device settings when devices' updates are presented. Previously the user had to manually re-select the device to apply the update
  11. Fixed total connected watts on Excel based reports are correctly considered when the panel load is set to predefined
  12. Current inequalities checks when the device used for the check is the primary device of the upstream the transformer connection
  13. Excel report schedules include two extra codes for RCD Type (&c_RCDType) and for circuit description without prefix (&c_load_description_no_prefix)
  14. Fixed the cable symbol in the schematic when Class II equipment is identified and not CPC is used
  15. The Analytical report will indicate the total armour of the cable used as CPC when having a parallel conductors' arrangement
  16. Zs and MaxZs have been included in the board label options
  17. MCCB Adjustability will be indicated in the device's short description (in schematic and reports)
  18. When selecting an element, the associated warning item will be selected too
  19. Improvements representing inactive circuit connections in the schematic diagram
  20. Inactive switchboard ways (open connections) are now part of the tree network view. The inactive tree elements are displayed with grey colour
  21. The inactive switchboard ways can be activated (close connection) by double clicking the inactive tree element
  22. Micro Farad calculation based on the kVAr value for the Power factor correction unit report.
  23. General project setting for AFDD devices are not required from Main menu > Functions > Calculations
  24. Tx connection selectivity checks between primary and secondary protective devices added
  25. Tx connection inrush current limiter considerations imroved
  26. Excel report schedules includes extra codes for circuit length (&c_length), for circuit design current (&c_design_current), for last project revision (&f_project_last_revision) and for last project revision date (&f_project_last_revision_date)
  27. Improvements when importing a large database from Legacy FastTest
  28. Custom phase labels will be displayed in the reports too instead of the standard L1,L2,L3
  29. The spare load % will be affected from the load defined in any spare circuit
  30. The Fixed Cg option has been included in the circuit details area in the Correction Factors page
  31. Middle East excel schedule codes can be used now in normal excel schedule templates too
  32. Transformer connection settings. The user can define on a downstream transformer the kVA rating, Z%, Inrush multiplier and duration, secondary connection type (Start or Delta), secondary fault level calculation.
  33. BS7671:2022 Amd2 changes: Default Type A RCD and warning if type AC is selected
  34. BS7671:2022 Amd2 changes: AFDD mandatory in non domestic and recommended for domestic
  35. Source voltage regulation considerations during voltage drop calculation
  36. BS7671:2022 Amd2 changes: Included the AFDD Not required option to cover the cases where AFDDs can be omitted for specific premises types
  37. BS7671:2022 Amd2 changes: Socket-Outlet RCDs to BS7288 can be used only as an additional protection (Reg 531.3.4.1)