Installation does not require .Net Framework 3.5 anymore.
Connected load correctly displayed in Db schematic labels when using load densities
Correction to the voltage level when using a CTE transformer and a Phase-to-Phase circuit connection
Grouping factor fixed option saving issue
Fix when importing Tysoft DBs with observations
Fix the 'Way from' label on a new page where more than two supplies have been used and the supply board is a Distribution board
Improvements when creating the excel split board report. Now the third split section codes will be removed if only two sections are used
Electronic devices min multiplier Ir setting correction
Performance improvements when applying changes in the selectivity study
Auto updating device settings when devices' updates are presented. Previously the user had to manually re-select the device to apply the update
Fixed total connected watts on Excel based reports are correctly considered when the panel load is set to predefined
Current inequalities checks when the device used for the check is the primary device of the upstream the transformer connection
Excel report schedules include two extra codes for RCD Type (&c_RCDType) and for circuit description without prefix (&c_load_description_no_prefix)
Fixed the cable symbol in the schematic when Class II equipment is identified and not CPC is used
The Analytical report will indicate the total armour of the cable used as CPC when having a parallel conductors' arrangement
Zs and MaxZs have been included in the board label options
MCCB Adjustability will be indicated in the device's short description (in schematic and reports)
When selecting an element, the associated warning item will be selected too
Improvements representing inactive circuit connections in the schematic diagram
Inactive switchboard ways (open connections) are now part of the tree network view. The inactive tree elements are displayed with grey colour
The inactive switchboard ways can be activated (close connection) by double clicking the inactive tree element
Micro Farad calculation based on the kVAr value for the Power factor correction unit report.
General project setting for AFDD devices are not required from Main menu > Functions > Calculations
Tx connection selectivity checks between primary and secondary protective devices added
Tx connection inrush current limiter considerations imroved
Excel report schedules includes extra codes for circuit length (&c_length), for circuit design current (&c_design_current), for last project revision (&f_project_last_revision) and for last project revision date (&f_project_last_revision_date)
Improvements when importing a large database from Legacy FastTest
Custom phase labels will be displayed in the reports too instead of the standard L1,L2,L3
The spare load % will be affected from the load defined in any spare circuit
The Fixed Cg option has been included in the circuit details area in the Correction Factors page
Middle East excel schedule codes can be used now in normal excel schedule templates too
Transformer connection settings. The user can define on a downstream transformer the kVA rating, Z%, Inrush multiplier and duration, secondary connection type (Start or Delta), secondary fault level calculation.
BS7671:2022 Amd2 changes: Default Type A RCD and warning if type AC is selected
BS7671:2022 Amd2 changes: AFDD mandatory in non domestic and recommended for domestic
Source voltage regulation considerations during voltage drop calculation
BS7671:2022 Amd2 changes: Included the AFDD Not required option to cover the cases where AFDDs can be omitted for specific premises types
BS7671:2022 Amd2 changes: Socket-Outlet RCDs to BS7288 can be used only as an additional protection (Reg 531.3.4.1)