Calculations & Checks / Conduit Sizing
« Last post by mbd-uk on 10 December 2023, 18:08 »
Can anyone assist with understanding and resolving the 63mm conduit for 2 x 2.5mm Twin and Earth?
While the cable length in 80m only final drops will be installed in conduit.

12
ElectricalOM for Advanced Users / Surge Protection Kit
« Last post by mbd-uk on 10 December 2023, 16:25 »
Where the supplier provides surge protection as a kit, is it possible to install the SPD as a direct connection, without using a way number.
This application is a single phsase consumer unit
13
ElectricalOM for Advanced Users / Re: RCD Protection
« Last post by Mert on 23 November 2023, 16:12 »
Hi AndyZ,

If that box is not checked EOM will consider the overcurrent protection device as the main device for the earth fault calculations and checks. If it is checked, the RCD data will be used for earth fault calculations instead. This is only relevant to TN systems.

Hope that helps.
14
ElectricalOM for Advanced Users / RCD Protection
« Last post by AndyZ on 21 November 2023, 15:24 »
Hi, recently, during my design, I noticed when selecting protection devices, there is a tick box for the 'additional RCD/Earth fault protection'; and another tick box for 'RCD Devices are only used for additional protection'. I wonder in what condition those box should be ticked? Thanks.
15
Calculations & Checks / Re: Parallel conductor It(A) critical message
« Last post by jw on 10 November 2023, 21:13 »
Spacing the cables, if possible, can help as the grouping factor will not be considered

16
Calculations & Checks / Re: Parallel conductor It(A) critical message
« Last post by Mert on 08 November 2023, 10:38 »
EOM calculates and displays the result for one conductor of a parallel bunch, so, what you see is the current would pass through via one conductor of the whole bunch. To remove this you need to reconsider your cross-sections.
17
Calculations & Checks / Parallel conductor It(A) critical message
« Last post by mattwilson83 on 08 November 2023, 09:44 »
I always get a critical message when using parallel conductors, the It(A) is only calculating the single conductor and not the parallel conductor. Is there a way to clear the critical warning.


18
ElectricalOM for New Users / Re: Consumer Unit Schedules
« Last post by Unknown on 06 November 2023, 14:30 »
Hi

Thanks for the update. That looks ideal for our needs.
19
ElectricalOM for New Users / Re: Consumer Unit Schedules
« Last post by admin on 06 November 2023, 13:56 »
Hello,

We made some changes and the Excel-based report will work as expected with extension boards. This will be available in the upcoming update. Please see the image below:


20
ElectricalOM for New Users / Consumer Unit Schedules
« Last post by Unknown on 03 November 2023, 10:40 »
Hi Mert

Thanks for the reply. I think the excel templates will be very useful.

I've just been trying out the ones already in ElecOM and I have a number of boards with an 'extension board' but they are not recognised as split boards for the excel templates. They are recognised as a DB but don't display the extension board part. Am I doing something wrong?